Send Message

E312 Excavator Chain Roller Upper Roller 50Mn Material Track Undercarriage Parts

Product Details:
Place of Origin: Fujian, China
Brand Name: YYR
Certification: ISO\CE
Model Number: E312
Payment & Shipping Terms:
Minimum Order Quantity: 50 prieces
Packaging Details: wooden box
Delivery Time: 7-30 days
Payment Terms: L/C, T/T
Supply Ability: 50000 prieces/1 Month

Detail Information

Condition: New Product Name: Excavator Chain Roller
Packing: Wooden Case Excavator Undercarriage Parts: Brand New
Place Of Origin: China Video Outgoing-inspection: Provided
Machinery Test Report: Provided Marketing Type: Hot Product 2022
Warranty: 1 Year
High Light:

E312 Excavator Upper Roller

,

50Mn Track Undercarriage Parts

,

Excavator Upper Roller 50Mn

Product Description

E312 Excavator Chain Roller Upper Roller 50Mn Material Track Undercarriage Parts

 

 

Product name Excavator Undercarriage Parts
Condition 100% new
Color Yellow or Black 
Material 50Mn
Warranty time One Year / 2000 hours(Normal life 4000 hours)
Packing Standard exported wooden pallet
Time of delivery Within 3 davs after payment receipt
Port of shipment XIAMEN&SHANGHAI
OEM&ODM Acceptable
Payment terms Alibaba trade assurance payment, Western Union, T/T

 

E312 Excavator Chain Roller Upper Roller 50Mn Material Track Undercarriage Parts 0E312 Excavator Chain Roller Upper Roller 50Mn Material Track Undercarriage Parts 1

 

 

E312 Excavator Chain Roller Upper Roller 50Mn Material Track Undercarriage Parts 2

 

1. Are you a trader or a manufacturer?
We are an integrated enterprise of industry and trade. The factory and sales department are located in Nan'an District, Quanzhou City.

 

2. How can I be sure the parts are right for my excavator?
Give us the correct model/machine serial number/any number on the part itself. Or measure the part and give us dimensions or drawings.

 

3. What are the payment terms?
We usually accept T/T or trade assurance. Other terms can also be negotiated.

 

4. What is your minimum order quantity?
It depends on what you're buying. Usually, our minimum order is a 20ft FCL and LCL containers (less than one container load) are acceptable.

 

5. What is your delivery time?
FOB Xiamen or any Chinese port: 20 days. If there are parts in stock, our delivery time is only 0-7 days.

 

6. How is the quality control?
We have a complete quality control system, and each link has a one-to-one person in charge to produce perfect products. A team will carefully inspect product quality and specifications, monitoring each production process until the package is fully loaded to ensure the product enters the container safely.

Get in touch with us

Enter Your Message

You Might Be Into These